Bengough Water Treatment Plant

Bengough, SKSep 2019 to May 2020

New plant building, membrane treatment units, vertical turbine pumps with VFDs, SCADA controls and a new 200 mm sewer line. Concrete, framing and insulating self-performed.

At a glance

Client
Town of Bengough
Location
Bengough, SK
Focus area
Infrastructure
Status
Completed
Timeline
Sep 2019 to May 2020
Contract value
Approx. $2.1M

Scope

What ECM built

  • New water treatment plant building
  • Upgraded envelope on the existing building
  • Building and systems to NECB 2017
  • Membrane treatment units
  • Vertical turbine pumps with VFDs and SCADA controls
  • New 200 mm sewer line
Bengough water treatment plant exterior wrapped for winter

Photos

From the site

Open excavation in front of a small-town water plant, winter sky

Have a project like this one?

Tender documents, an RFP, a prequalification request or a first description of the building. Send it over, or call 306-519-7569.