Bengough Water Treatment Plant
New plant building, membrane treatment units, vertical turbine pumps with VFDs, SCADA controls and a new 200 mm sewer line. Concrete, framing and insulating self-performed.
At a glance
- Client
- Town of Bengough
- Location
- Bengough, SK
- ECM's role
- General Contracting
- Focus area
- Infrastructure
- Status
- Completed
- Timeline
- Sep 2019 to May 2020
- Contract value
- Approx. $2.1M
Scope
What ECM built
- New water treatment plant building
- Upgraded envelope on the existing building
- Building and systems to NECB 2017
- Membrane treatment units
- Vertical turbine pumps with VFDs and SCADA controls
- New 200 mm sewer line

More projects
More Infrastructure projects

River Street Reservoir Refurbishment
Refurbishment of the City of Prince Albert's River Street reservoir: concrete repairs, new hatches and ladders, and cleaning and disinfection.
- Client
- City of Prince Albert

Dalmeny Pumphouse and Reservoir Upgrades
A new pumphouse and reservoir upgrades for the Town of Dalmeny, with Catterall & Wright as the consulting engineer.
- Client
- Town of Dalmeny

Churchbridge Water System Upgrades
A new plant addition built on top of the town's existing treated water reservoir, with new membrane treatment units.
- Client
- Town of Churchbridge
- Value
- Approx. $2.7M