Carrot River Water Treatment Plant Upgrade

Carrot River, SKSep 2020 to May 2021

New dry well and below-grade raw water reservoir, plus a 3,200 sq ft plant building built partly over the existing treated water reservoir. Awarded on qualifications and the most competitive tender; concrete and framing self-performed.

At a glance

Client
Town of Carrot River
Location
Carrot River, SK
Focus area
Infrastructure
Status
Completed
Timeline
Sep 2020 to May 2021
Contract value
Approx. $3.2M

Scope

What ECM built

  • New dry well
  • Below-grade raw water reservoir
  • 3,200 sq ft plant building over the existing and new reservoirs
  • Membrane treatment units
Carrot River water treatment plant building, white metal cladding with green trim

Photos

From the site

Open excavation in front of a small-town water plant, winter sky