Ogema Water Treatment Plant

Ogema, SKJun 2019 to Feb 2020

An addition to the town's water treatment plant: a 410,000-litre concrete reservoir, two membrane treatment units, vertical turbine pumps with VFDs, and a new plant building linked to the existing one. Concrete, framing and insulating self-performed.

At a glance

Client
Town of Ogema
Location
Ogema, SK
Focus area
Infrastructure
Status
Completed
Timeline
Jun 2019 to Feb 2020
Contract value
Approx. $1.8M

Scope

What ECM built

  • New 410,000-litre concrete reservoir
  • New plant building linked to the existing one
  • Two membrane treatment units
  • Vertical turbine pumps with VFDs
  • Decommissioning of existing wells
  • Integration of existing wells with the new controls
Completed grey metal-clad water treatment plant with ECM truck

Photos

From the site

Open excavation in front of a small-town water plant, winter sky

Have a project like this one?

Tender documents, an RFP, a prequalification request or a first description of the building. Send it over, or call 306-519-7569.