Churchbridge Water System Upgrades

Churchbridge, SKOct 2020 to Jun 2021

A new plant addition built on top of the town's existing treated water reservoir, with new membrane treatment units.

At a glance

Client
Town of Churchbridge
Location
Churchbridge, SK
Focus area
Infrastructure
Status
Completed
Timeline
Oct 2020 to Jun 2021
Contract value
Approx. $2.7M

Scope

What ECM built

  • Plant addition built on the existing treated water reservoir
  • Membrane treatment units
Membrane treatment skid being moved into the Churchbridge water plant

Photos

From the site

Open excavation in front of a small-town water plant, winter sky